Location:
Pittsburgh, Pennsylvania
Owner:
Oxford Development Company
Engineer:
Walker Parking Consultants
Contract Amount:
$420,000
Completion Date:
September 2009
Work Description:
The Oxford Garage is an independent structure located
next to the Oxford Centre Tower. It consists of nine
supported levels and accommodates 850 vehicles. The
garage is a Filigree floor deck system consisting of
precast, prestressed concrete planks and beams
compositely bonded with a cast-in-place concrete
topping.
The Structural Engineer completed a visual condition survey of the parking facility and identified 14 Filigree beams that exhibited significant deterioration and broken prestressed cables. Having previously completed more than $2.5 million dollars of garage restoration work for the Owner, CPS was retained to restore the distressed beams.
The repair work consisted of erecting shoring two levels below each beam, carefully removing the spalled concrete in the beam bottom flange and installing the "grab-it" cable splice coupler on all broken tendons. After tensioning the new tendons, a fast-setting repair mortar was pumped into the custom formwork that allowed a minimum ¾ inch concrete coverage over all cable splices. This complex repair project was completed over two summers while the garage remained in operation.